Skip to main content
Opens in a new tab
The PLC is the “brain” of the machine
The Inverter (Controller) of the Evaporator
The Inverter (Controller) of the Compressor
The fuses for inverters and grid - all switches have to be in the UP position
The router LED: green and blinking = connected red or not blinking = no connection
All
Des. Periphery Problems
Desalination Machine
Desalination Machine Errors
Display Alarms
Ice Machine
Ice Machine Errors
Ice Periphery Problems
Alarm on Temperature
Antiscalant Pump Alarm
Antiscalant Tank Alarm
Differential Pressure Switch Alarm
Electric Conductivity Alarm
Feed/Permeate LED Alarm
Pressure Alarm
Red 4G LTE LED
Red LED on Connector (PLC)
Screen not available
UV Inside Alarm
UV Outside Alarm